Design Project Management - how do you do it?

iab: Indeed, those front end checks should be moved to the front of the process. However, in a consultant, I would assume that my client has done this check and is sure they want to do the project.

Even in house, these checks can be hard to do. I’ve faced a differing levels of pressure to move ahead with projects in spite of finding critical problems.