almost every industrial design project that I work on used waterfall gantt chart system: brief> research> concept> development> manufcturing.
This can be tedious and long, the worst thing happen is that after we make the tooling we notice stupid problem that should be fixed during concept stage. we feel stupid.
I Stumble upon scrum - design sprint method and I found it interesting, quickly develop viable minimum product in a short time span.
Most Scrum/ design sprint often used in developing apps or digital products since its very quick to generate prototype.
I wonder is its aplicable for physical product project, have anyone have experience with implementing this?
Thanks